Owner | Ministry of Water Resources and Irrigation, Egypt | |
Client | Egyptian Armed Forces Engineering Authority | |
Engineer | Hydro. Envir. & Infrastr. Studies |
Description
Turnkey construction of (2) pumping stations (P07 & P08). The pumping capacity of each station is 7.5 million m3/day.
The stations are part of a mega project for the collection and treatment of sewage and agricultural drainage with a capacity of 6 million m3/day to reclaim 362,000 fedans South of Dabaa Corridor.
Scope of works includes all civil, architectural finishing, electromechanical, infrastructure, landscape, and road works.