Owner | Qatar National Bank AlAhli (QNB) | |
Client | Egyptian Armed Forces Engineering Authority | |
Engineer | ECG Engineering Consultants Group / Shaker Consultancy Group |
Description
The project is turnkey construction. Scope of works includes all civil, architectural finishing, electromechanical and landscape works. The total built up area is 35,755 m2 . The building consists of 2 basements, ground floor and 7 floors.
The contract is on re-measure basics.